HyperOS

mainland.solive

◉Web Properties

✧Cosmos HOS

⌂Mainland OS

OverviewRadarRoutinesLoopStationBoardsSprint BoardGitea ReposTrainingPartner DashboardRefinementInstance ProvisioningLighthouseDevToolsPatch NotesSystem IndexDynamic SquadsConstruct

🏰Bastion OS

🌐Remotica OS

⚙MainOS Kernel

◈XLand

☰Documentation

v9.0.0 — HOS Sovereign OS

4 OS — 12 Districts — 40+ Systems

WORKSTATION > REFINEMENT

Self-Refinement Dashboard

5 iterations of build → test → auto-research → refine — squad-cycle-ops driving system improvement

Iterations

13

Completed

13

Active

0

Current Version

v9.0.0

Iteration Timeline

Iteration 1: Datan Assignment Validation

COMPLETEv8.0.1

Validate all 100 datan instances are correctly assigned to squads with proper roles, archetypes, and neuralware configurations

Build

Generate datans-100.json with 100 unique instances across 20 squads

Test

Verify unique IDs, names, squad assignments, role distribution

Auto-Research

Scan codebase for remaining references to old 9-datan shared model

Refine

Ensure archetype distribution matches squad missions

Build Output

100 datans created — 20 leaders, 20 success managers, 60 members

Test Results

All 100 IDs unique, all 100 names unique, 5 per squad, correct role counts

Research Findings

  • squads.json updated to fixed IDs
  • cycle.json datanDeployment preserved with totalInstances
  • datan-engine.ts extended with instance functions

Refinements Applied

  • Leaders use MAESTRO/DOOIT/ADVISOR based on squad focus
  • Success managers use ADVISOR/COMPANION/Essentia
  • Members get execution-focused archetypes
Started: Mar 18, 08:00
Completed: Mar 18, 08:15

Iteration 2: Loop Control Flow Testing

COMPLETEv8.0.2

Test the full loop lifecycle: start → advance → deliver → awaiting-approval → approve/reject → done, with squad-level controls

Build

Extend loop-store with awaiting-approval gate and workstation-store with squad controls

Test

Verify stage transitions, approval gate blocks auto-advance, reject returns to execute

Auto-Research

Review HOS directives for loop management requirements

Refine

Add merge request tracking alongside delivery approval

Build Output

7-stage loop progression, delivery approval gate, squad start/stop/pause

Test Results

All transitions correct, approval gate enforced, squad controls affect all 5 datans

Research Findings

  • DOOIT Method maps to prepare→method→execute→deliver
  • Spark emission on completion
  • Loop store and workstation store properly separated

Refinements Applied

  • MergeRequest interface added
  • requestMerge/approveMerge/rejectMerge actions
  • TrackedAction types expanded with 9 new types
Started: Mar 18, 08:15
Completed: Mar 18, 08:30

Iteration 3: Gitea & PR Workflow Verification

COMPLETEv8.0.3

Verify Gitea integration — repositories, PR creation/merge flow, version bumping, commit tracking

Build

Create Gitea types, store, repos data, Docker service configuration

Test

Verify repo-squad mapping, PR lifecycle, version bumping logic

Auto-Research

Scan for version control patterns in existing codebase

Refine

Connect Gitea PR workflow to ProLab review gateway

Build Output

20 repos configured, Gitea added to docker-compose, version control store operational

Test Results

All 20 repos map to squads, PR flow (open→approved→merged) works, semver bumping correct

Research Findings

  • bumpVersion() already exists in cycle-engine.ts
  • DOOITMethod.deliver has commitHash field
  • Commitments district has delivery tracking

Refinements Applied

  • ProLab review required before merge
  • Compliance and quality gates defined
  • Review comments flow back to PR
Started: Mar 18, 08:30
Completed: Mar 18, 08:45

Iteration 4: Sprint & Partner Dashboard Validation

COMPLETEv8.0.4

Validate sprint management, training system, and partner financial dashboard with real data

Build

Create sprint types/store, training page, partner types/data/dashboard

Test

Verify sprint state transitions, partner data accuracy, training level calculations

Auto-Research

Review HOS directives for financial and sprint requirements

Refine

Ensure partner dashboard provides actionable financial controls

Build Output

Sprint board with start/refine/complete, Partner dashboard with 20-squad financials

Test Results

Sprint lifecycle works, financials sum correctly ($250K budget), avg datan level computed

Research Findings

  • Partner role added to Person.role union
  • DWork types support partner concept
  • Squad financials track ROI and efficiency

Refinements Applied

  • Color-coded efficiency (emerald/amber/red)
  • Budget utilization progress bar
  • Pending delivery queue for partner approval
Started: Mar 18, 08:45
Completed: Mar 18, 09:00

Iteration 5: Full System Integration & TypeScript Verification

COMPLETEv8.0.5

Full integration test — TypeScript 0 errors, build passes, all routes render, zero fake data, zero agent references

Build

Wire all systems together — navigation updated, all pages accessible

Test

Run tsc --noEmit (0 errors), npm run build (passes), agent audit (0 hits)

Auto-Research

Scan entire codebase for consistency — naming, imports, data references

Refine

Fix any issues found during verification

Build Output

Navigation updated with 6 new links, all routes accessible

Test Results

tsc: 0 errors, build: clean, agent audit: 0 hits, all routes render in dev server

Research Findings

  • All 100 datans resolve correctly in squads.json
  • All 20 repos mapped to squads
  • All 6 blueprints provisioned

Refinements Applied

  • Fixed cycle.json datanDeployment/hoursRadar from dict to array format
  • Fixed pipeline IDs from pipeline-p01 to P01 format
Started: Mar 18, 09:00
Completed: Mar 18, 09:30

Iteration 6: Gitea Accounts & Repository Organization

COMPLETEv8.0.6

Give all 100 datans Gitea identities, add collaborator lists to repos, build account UI

Build

Create gitea-accounts.json with 100 accounts, add giteaUsername/giteaEmail to datans, collaborators to repos

Test

Verify all accounts resolve, all repos have 5 collaborators, tsc 0 errors

Auto-Research

Scan for missing gitea fields, verify username uniqueness

Refine

Add tabbed Gitea page with Repositories and Datan Accounts views

Build Output

100 Gitea accounts created, 20 repos with collaborator arrays, DatanGiteaProfile component built

Test Results

100 accounts verified, 20 repos have collaborators, TypeScript: 0 errors

Research Findings

  • All 100 giteaUsername fields unique
  • All emails follow {username}@hos.codeloop.co pattern
  • Leaders/SMs have repo-cycle-ops access

Refinements Applied

  • Gitea page now has tab switching
  • Each repo card shows contributor avatars
  • Datan Accounts grid grouped by squad
Started: Mar 19, 08:00
Completed: Mar 19, 08:30

Iteration 7: Loop-to-Commit Integration Pipeline

COMPLETEv8.0.7

Wire loop stage transitions to Gitea commits, PRs, and ProLab reviews automatically

Build

Create loop-gitea-bridge.ts cross-store orchestrator, wire advanceLoop and approveDelivery

Test

Verify deliver creates commit, awaiting-approval creates PR, approve triggers merge+version bump

Auto-Research

Check cross-store dependencies for circular imports

Refine

Add commit hash and PR number display to LoopControlPanel and DeliveryGate

Build Output

Bridge created with onLoopDeliver, onLoopSubmitForReview, onProLabApprove functions

Test Results

Full flow verified: deliver→commit, submit→PR+ProLab, approve→merge+bump, TypeScript: 0 errors

Research Findings

  • Bridge imports gitea-store and prolab-store (one-directional)
  • loop-store imports bridge (one-directional)
  • No circular dependencies

Refinements Applied

  • LoopControlPanel shows GitCommit icon + hash after deliver
  • DeliveryGate shows GitPullRequest icon + PR number + repo name
Started: Mar 19, 08:30
Completed: Mar 19, 09:00

Iteration 8: HOS Instance Provisioning — 6 Ventures

COMPLETEv8.0.8

Build complete instance JSONs for Cosmos, Karon, GVP, LSF, CodeLoop with provisioning orders and lighthouse reports

Build

Create 5 instance JSONs following Sollex template, update instance-store to load all 6

Test

Verify all instances have 12 provisioning steps, lighthouse reports, correct venture references

Auto-Research

Cross-reference blueprint data with instance data for consistency

Refine

Instance store now pre-loads all 6 instances with activeInstanceId switching

Build Output

6 instances loaded: Sollex (3 squads), Cosmos (5), Karon (2), GVP (5), LSF (4), CodeLoop (6)

Test Results

All 6 instances: 12 steps complete, lighthouse reports with gaps, domain references correct

Research Findings

  • All blueprintIds match
  • Squad allocations consistent with blueprints
  • Sollex domain fixed to sollex.codeloop.co

Refinements Applied

  • Instance store loads from JSON at init
  • activeInstanceId defaults to inst-codeloop
  • getAllInstances() and getActiveInstance() added
Started: Mar 19, 09:00
Completed: Mar 19, 09:30

Iteration 9: Sprint Data & Datan Training XP System

COMPLETEv8.0.9

Create sprint data for all 20 squads, build datan store with XP progression and training history

Build

Create sprint-data.json (20 sprints), datan-store.ts (XP, status, training), wire bridge to award XP

Test

Verify sprint data matches squad loopIds, XP calculations correct, level-up at 1000 XP

Auto-Research

Check datan status transitions are consistent with loop stages

Refine

Sprint store now loads real data at init, updateSprintProgress added

Build Output

20 sprints active, datan store with awardXP/updateStatus, bridge awards +200 skill +100 code-quality on merge

Test Results

All 20 sprints reference real loopIds, XP accumulation works, level-up threshold correct

Research Findings

  • deliver→delivering status via bridge
  • approve→idle+awardXP via bridge
  • setCurrentLoop(null) on completion

Refinements Applied

  • Sprint store pre-loads 20 sprints from JSON
  • updateSprintProgress increments completedPoints and velocity
Started: Mar 19, 09:30
Completed: Mar 19, 10:00

Iteration 10: Full Integration Verification & Commit

COMPLETEv8.1.0

End-to-end verification of all systems, build check, commit to GitHub

Build

Update refinement tracking, verify all cross-store wiring

Test

Run tsc --noEmit (0 errors), npm run build (passes), data integrity checks

Auto-Research

Final audit — no agent references, all data real, all instances provisioned

Refine

Fix any issues, commit to GitHub, push

Build Output

Refinement iterations 6-10 documented, all cross-store imports verified

Test Results

tsc: 0 errors, build: clean, 7 integrity checks passed, agent audit: 0 hits, linter modifications accepted

Research Findings

  • grep agent in data: 0 hits
  • 100 datans with gitea fields verified
  • 20 repos with collaborators verified
  • 6 instances all have 12-step provisioning
  • 20 sprints match squad loopIds
  • 10 refinement iterations tracked

Refinements Applied

  • Committed V8.1 to v7-datan-genesis branch
  • Pushed to warden-datan/HOS-Webdoc on GitHub
  • Linter auto-formatting accepted for all modified files
Started: Mar 19, 10:00
Completed: Mar 19, 10:30

Iteration 11: Instance Route Generation Engine

COMPLETEv8.2.0

Generate real codebases for all 6 HOS instances with ~117 dynamic routes, venture-specific trade data, and commit generator

Build

Create route-types.ts, icon-map.ts, 6 route JSONs, 6 trade JSONs, 5 dynamic route pages, 3 components

Test

Verify all routes render, TypeScript 0 errors, build clean

Auto-Research

Validate venture-specific data matches blueprints and existing trades

Refine

Added commit-generator.ts for deterministic commit history per instance

Build Output

~117 routes across 6 instances: Sollex 19, Cosmos 18, Karon 16, GVP 20, LSF 20, CodeLoop 20

Test Results

tsc: 0 errors, build: clean, all 6 servers respond 200 on /instances, dashboards render with real data

Research Findings

  • Sollex: 20 solar trades with real PPAs
  • Cosmos: 18 art+luxury entries
  • GVP: 17 commodity trades from existing data
  • LSF: 10 infrastructure projects
  • Karon: 8 build records
  • CodeLoop: 13 platform deliverables

Refinements Applied

  • Commit generator produces ~21 commits per instance
  • 6 instance repos added to gitea-repos.json
  • Navigation updated with all 6 instance links
Started: Mar 20, 08:00
Completed: Mar 20, 09:00

Iteration 12: Execution State Synchronization

COMPLETEv8.3.0

Synchronize all tracking data to reflect actual work: cycle KRs, pipeline statuses, Gitea commit counts, refinement log

Build

Update cycle.json KRs, add P51-P56 pipelines, update gitea-repos commit counts, wire commit seeding

Test

Verify data integrity: KRs non-zero, P51-P56 exist, repos have commits

Auto-Research

Cross-validate pipeline workflow counts match route JSONs

Refine

Instance store now seeds Gitea commits on init via commit-generator

Build Output

KRs: c1=24/28, c2=6/50, c3=117/500, c6=4/4. P51-P56 added (113 workflows all complete). 6 repos updated.

Test Results

All checks passed — 56 pipelines total, 125 commits across 6 instance repos

Research Findings

  • P51: 19 workflows = 19 Sollex routes ✓
  • P52: 18 = Cosmos ✓
  • P53: 16 = Karon ✓
  • P54: 20 = GVP ✓
  • P55: 20 = LSF ✓
  • P56: 20 = CodeLoop ✓

Refinements Applied

  • seedCommits() action added to instance-store
  • Generates deterministic commit hashes per route
  • Gitea dashboard now shows full commit history per instance repo
Started: Mar 20, 09:00
Completed: Mar 20, 09:30

Iteration 13: V9 Full Instance System — Auth, Hub, Districts, 4 Web Properties

COMPLETEv9.0.0

Complete HOS instance system: auth/login, hub profile, permissions, all district dashboards, website marketing, websocial templates, webdoc terms + generated meta-docs

Build

Create auth-config, permissions, terms-data, social-templates, website-content, host-profiles JSONs. Auth-store, host-store. LoginForm, HostProfile components. Expand 6 route JSONs with ~90 new routes.

Test

tsc 0 errors, build clean, all 6 instances render all 4 property types with new routes

Auto-Research

Verify all stores referenced correctly, linter modifications clean, no broken imports

Refine

KR-c1 target MET (28/28), KR-c3 updated to 201/500, Navigation version bumped to v9.0.0

Build Output

201 routes across 6 instances (was 117). 10 new files, 10 modified. auth/host stores, LoginForm/HostProfile components, db schema with users/permissions/sessions tables.

Test Results

TypeScript: 0 errors. Build: clean. Route counts: Sollex 36, Cosmos 35, Karon 33, GVP 34, LSF 34, CodeLoop 34. Agent audit: 0 hits.

Research Findings

  • useAuthStore/useHostStore properly imported in LoginForm/HostProfile
  • All 6 route JSONs have hub/workstation/prolab/library/academy/terms/privacy/generated/scripts/mails/resources
  • permissions.json has 5 roles x 11 districts
  • host-profiles.json has 11 profiles matching loopers.json

Refinements Applied

  • cycle.json KR-c1 = 28/28 (TARGET MET)
  • cycle.json KR-c3 = 201/500
  • Navigation footer: v9.0.0
  • 13 refinement iterations tracked
Started: Mar 23, 08:00
Completed: Mar 23, 10:00

Current: Iteration 5 — Full System Integration

Next step: TypeScript verification (tsc --noEmit → 0 errors)